DMADV - Measure
Measure phase
- DFSS projects can be categorized as design or redesign of an entity.
- Customers are fully identified and their needs collected and analyzed.
- The most appropriate set of CTQs metrics are determined in order to measure and evaluate the design.
- The numerical limits and targets for each CTQ are established.