Skip to main content Skip to navigation

DMADV - Measure

Measure phase

  • DFSS projects can be categorized as design or redesign of an entity.
  • Customers are fully identified and their needs collected and analyzed.
  • The most appropriate set of CTQs metrics are determined in order to measure and evaluate the design.
  • The numerical limits and targets for each CTQ are established.