Skip to main content Skip to navigation

Argent Court

Argent Court data centre main hall is shown on the right, the proposed HPC area is shown in the picture on the left.
No raised floor or lighting installed.

Thermal walls and ceiling installed.


img_0605.jpg

 inside1