Skip to main content Skip to navigation

Bus Interchange and The Oculus Building - External Wireless upgrade

The UOW frame work contractor Sudlows will be upgrading the external Wi-Fi around the Bus interchange and the Oculus building using high level access equipment. To reach the high level access points the access equipment will need to be positioned on the path way and barriered. No facilities will be affected however wireless network service will be affected in a localised area while the unit is being replaced. The works will take place on the 31st January 2023.