Draft Report Outline
Update 12 March 16:46
Draft Report has been submitted, the report and appendices can be downloaded from the lefthand bar.
Draft Report Outline/Work Plan
EXECUTIVE SUMMARY 2 ALL
SUMMARY REPORT 3
Contents 4
Figures and Tables 7
1.1 Introduction 9
1.1.2 Smoke Control 9 Anthony
1.2 Project Background 10
1.3 Theory 27
1.4 Project Management 29 Alex Millar
1.5 System Development 29
1.6 Testing, Observations and Results 43
1.7 Analysis and Discussion of results 53
1.8 Evaluation 55 All
1.9 Recommendations for further work 55 All
1.10 Conclusions 56 All
2 TECHNICAL REPORT 57
2.1 Test Rig Design 58 Jamie
2.1.2 Office Rig Conceptual Design 58 Jamie
2.1.3 Smoke Production Conceptual Design 60 Jamie
2.2 CFD Simulations 66
2.2.2 Challenges within the Simulations 66 Will
2.2.3 Theory and Dynamic Similarity of CFD 69 Will
2.3 Control System 73
2.3.2 Software 84 Nariman
2.4 Testing 86
2.4.2 Testing 91 Jamie
2.5 Architectural System Integration 92
3 MANAGEMENT REPORT 97 Alex Millar
3.1 Project Management 98 Alex Millar
3.2 Work Breakdown Structure 101 Alex Millar
3.3 Time Planning 102 Alex Millar
3.4 The Project buffer 103 Alex Millar
3.5 Belbin Questionnaire: 103 Alex Millar
3.6 The Management Structure 105 Alex Millar
3.7 Project Progress 106 Alex Millar