Campus Timeline:Millburn House (2007)
Millburn House was a pre-existing building that we extended and refurbished. It now supports a range of study and research activities from disciplines as different as Nuclear Magnetic Physics and Theatre Studies.
- Contains both an ion cyclotron and a theatre studio - not many buildings do.
- Later extended to house Film and Television Studies.
Watch a video about the origins of Millburn House.
Essential Information
Start & Finish dates | TBC |
Funded by | TBC |
Budget | £9.75M |
Requested by | TBC |
Managed by | TBC |
Architects | Architects Design Partnership |
Quantity Surveyors | Jacobs |
Mechanical Engineers | Couch Perry Wilkes |
Electrical Engineers | Couch Perry Wilkes |
Structural Engineers | Scott Wilson |
Main Contractor | William Sapcote / GAJ Construction |
Landscaping | N/A |
Statistics
Basic Building Cost | £5.5m |
Gross Floor Area | 7,386m2 |
Function Areas and Their Size | Data Halls: 400m2 |
Electricity Consumption | 235kWh/m2 |
Gas and Heat Consumption | 86kWh/m2 |
Low Carbon Energy Generation | No |
Water use | 1,629m3/year |