Campus Timeline:Advanced Materials Manufacturing Centre (2016)
The Advanced Materials Manufacturing Centre (AMMC) provides a place for our researchers to test manufacturing and assembly processes in realistic conditions. It houses both an Applications Facility and the Advanced Steel Research Centre (ASRC).
The ASRC supports our researchers in developing new processing technologies to transform the (UK) steel industry into a low energy, resilient manufacturing base for high value-added advanced steels, with a focus on strip steels.
- Clad in metal panels configured in a dazzle pattern, much like the prototype vehicle wraps used in the industry.
- Offers views of different technical processes as you walk through the building.
- The building itself represents the engineering capabilities of today.
Essential Information
Start & Finish dates | July 2015 – May 2016 |
Funded by | HEFCE |
Budget | £5m |
Requested by | WMG |
Managed by | Gleeds/Estates Office |
Architects | ADP |
Quantity Surveyors | Gleeds |
Mechanical Engineers | Hoare Lea |
Electrical Engineers | Hoare Lea |
Structural Engineers | Scott White Hookins |
Main Contractor | Deeley Construction |
Landscaping | Deeley Construction |
Statistics
Basic Building Cost | £959/m2 (Excluding Prelims, OH&P & Design Fees) |
Services Costs | £670/m2 (Excluding Prelims, OH&P & Design Fees) |
External Works | £252/m2 (Excluding Prelims, OH&P & Design Fees) |
Gross Floor Area | 1,575m2 |
Total Area of Site | 0.5 hectares |
Function Areas and Their Size | Make Like Production Facility/Applications Facility 353.9m² NDT Area 50.1m² ESEM, FIB SEM, SIMs 145.5m² Furnace Room 81.9m² CSLM, DTA/DSC, IRTG 64.8m² Gleeble 83.3m² and associated Hydraulic Unit 12.2m² Project Lab 58.5m² Open plan offices 234.6m² Office 14.7m² Meeting room 16.8m² |
Area of Storage | 57m2 |
Area of Circulation | 216m2 |
% of Ground Used by Community | 0% |
% of Buildings Used by Community | 0% |
Electricity Consumption | TBC kWhrs/m2 |
Fossil Fuel Consumption | TBC kWhrs/m2 |
Low Carbon Energy Generation | TBC kWhrs/m2 |
Water use | TBC m3/year |
% Rainwater/greywater | TBC % of total Water |
Steps taken to reduce environmental impact | Design to EPC A Rating |